• Led an engineering team of 5 in designing the software and hardware systems for a lunar rover to study water-ice on the Moon.
  • Authored 5 comprehensive mission proposals, over 100 pages each, detailing technical components, engineering plans, and more.
  • Collaborated with thermal, mechanical, electrical, and CDH teams to support system integration and optimization.